Third workday 18.5.2003

By Poltsi

Rest of the welding was completed and most parts got the first coat of paint.


Medium [600x800]
Large [1200x1600]
The plates welded to the square pipe legs.

Medium [800x600]
Large [1600x1200]
The leg anchors. The holes are to adjust the height on uneven ground.

Medium [800x600]
Large [1600x1200]
Parts painted and hanging to dry. The paint used is a industrial 2-component paint.

Medium [800x600]
Large [1600x1200]

Medium [600x800]
Large [1200x1600]
Drying legs.

Medium [600x800]
Large [1200x1600]
And anchors.

Medium [800x600]
Large [1600x1200]