Second workday 17.5.2003

By Poltsi

Most of the welding was completed.


Medium [600x800]
Large [1200x1600]
Lemon drilling.

Medium [800x600]
Large [1600x1200]
Welding the first rafter.

Medium [600x800]
Large [1200x1600]
While Lemon drills screw holes in the ledge beam plates.

Medium [600x800]
Large [1200x1600]
The four first rafters completed and connected, giving a hint of the size of the pavilion.

Medium [600x800]
Large [1200x1600]
The first ladder-beam.

Medium [600x800]
Large [1200x1600]
Lemon marks the screw hole places where the ledge beam plate is connected.

Medium [600x800]
Large [1200x1600]
The parts are piling up.

Medium [800x600]
Large [1600x1200]
And it's going to be HUGE!

Medium [800x600]
Large [1600x1200]
Detail of the mid-beam assembly.

Medium [600x800]
Large [1200x1600]
From another angle.

Medium [800x600]
Large [1600x1200]
Just look at the size of it. You could basically park two midsize cars under it.

Medium [800x600]
Large [1600x1200]
Welding the crossbeam to the plates.

Medium [800x600]
Large [1600x1200]
The parts, in piles. The parts furthest away are the legs, which are in three parts.